NTS stands alone as the sole trench and traffic safety equipment enterprise boasting a nationwide branch network. Our extensive, diverse inventory encompasses equipment available for both rental and sale, accompanied by traffic and trench safety engineering services. Additionally, we offer a broad OSHA-compliant training curriculum. Fundamentally, NTS is a service-oriented organization, a commitment reflected in our mission statement.

linkedin
email

Linear Slide Rail System Used for a Culvert Installation

A Las Vegas contractor was tasked with constructing new culverts and replacing deteriorating culvert lines located on the grounds of a future sporting arena. The project would require an excavation cut of 150-ft in length with a width of 32-ft and a depth of 16-ft. The second excavation required a linear run of 250-ft with a width of 27-ft and 35-ft depth on a hard rocky terrain classified as Type-B soil by the Competent Person on-site.

The project would be divided into multiple phases. The contractor needed to complete the project quickly as the contractor’s scope of work would need to be completed before other contractors could begin their portion of the project. The project site presented a challenge with a live road in close proximity to the excavation cut. Heavy-duty construction machinery and equipment would be stationed on the opposite side of the excavation. The contractor would require a protective system that could provide proper vertical clearance while addressing the pressure load caused by live traffic. Additionally, the protective system would have to extend its width capability to properly secure both sides of the excavation.

After reviewing several protective systems, the contractor selected a linear slide rail system with a sheeting guided frame. A slide rail system is a versatile protective underground system that can be used with a wide range of applications and paired with several modular components. For this project, the linear slide rail system would change its configuration as sections of the culvert poured in place were completed. The initial underground configuration would be composed of a 12-bay linear slide rail system with rolling struts inserted through the linear slide rail posts to provide the necessary support against the soil walls. The second underground configuration required a 10-bay linear slide rail system with rolling struts that would begin with 4 larger bays tapering to the necessary smaller size for the remaining 6 bays. The configuration would allow the contractor to construct a temporary ramp entrance directly below the excavation cut. This underground access would allow the contractor to easily unload the materials and equipment needed for the pouring-in.

All of the configurations provided the proper vertical and horizontal clearance for the culvert installation. Once the installation is completed, the new sporting arena and surrounding areas will have adequate drainage flow and distribution of stormwater minimizing the potential of flooding in the area. The contractor was extremely satisfied with the modular capabilities, easy installation, and vertical and horizontal clearance provided by the slide rail system.

 

Request a Free Consultation

Expert Corner RFI

We would love to hear from you! Please fill out this form and we will get in touch with you shortly.

Name
This field is for validation purposes and should be left unchanged.